Wrapping exterior columns
Front entrance columns
Cupped and worn shingles
Weathered hole in decking
Shingles being removed
Ridge vent cut open
New roofing installed
Exterior siding installation
Lift in use for full reach
Site exterior leveled and graded
Front entrance steps and railing
View from the upper deck
New barrier in place
Tiles in place and door trim painted
Railing installed on upper deck
Upper deck clean up
Lower deck pavers and columns
Water view from upper and lower seating
Interior windows with arch
Interior window with casing removed
Painting interior window casing
Trusses set in place
Windows and doors installed - Front
Windows and doors installed - Rear
Interior walls framed with windows and doors